Solar PV dossier to certify your project for Mivivienda Verde
We prepare the grid-tied PV system project your building needs for requirement 2.5 of Peru's MIVIVIENDA Sostenible programme, grades II+ and III+, ready for your certifier.
Request a dossier- 16real estate projects with a PV dossier prepared by EHS between 2020 and 2026
- 10days to deliver from the service order and advance payment
- 3 to 10kWp in the systems we designed, depending on grade and project size
What the programme asks for and what we solve
The certification procedure of the MIVIVIENDA Sostenible programme (version 09) includes requirement 2.5: a PV system that generates energy for indoor common areas, feeding the grid directly and without batteries, of at least 3 kWp per project. The certifier reviews data sheets with service life and warranty, equipment certificates, the solar exposure report and the electrical drawings. We prepare that complete package.
The Mivivienda Verde bonus is a subsidy for the buyer; what gets certified is the project. Confirm with your certifier the current version of the procedure and the capacity your grade requires.

What the delivery folder contains
- Reports
- Descriptive and calculation report, operating logic and technical specifications.
- Generation study
- System simulation in PV*SOL with expected yield, the basis of the solar exposure report.
- Drawings
- Rooftop module layout, array and structure detail, single-line diagram and panel board scheme, in DWG and PDF.
- Data sheets
- Modules, inverter, meter, structure, cabling and protections, with warranty and estimated service life.
- Certificates
- Current IEC and ISO certificates from the equipment manufacturers.
How we work with your team
You send the drawings
Architecture and electrical drawings of the project, with the general services board detail.
We confirm capacity and rooftop
We check the shade-free area and set the capacity for the grade the project is seeking.
We prepare the dossier
Design, simulation, drawings and reports in 10 days from the service order and advance payment.
Delivery and sign-off
You receive the complete folder and sign off the service. If the project changes later, we update the dossier.
Experience you can verify
Since 2020 we have prepared the PV dossier for 16 multi-family projects in Lima, in districts such as Barranco, Magdalena del Mar, Pueblo Libre and Jesús María, for builders and developers seeking certification at grades II+ and III+. In two of them we also supplied and installed the system.
Service terms
- Fixed-price proposal, valid for 30 days.
- 50 % payment with the service order and 50 % on delivery.
- Delivery in 10 calendar days.
- If the project changes after sign-off, we update the dossier as a separate service.
Frequently asked questions
What capacity does my project need?
Procedure version 09 sets a minimum of 3 kWp per project for requirement 2.5. The final capacity depends on the grade, the common-area demand and what your certifier indicates. We define it with you before designing.
Does the dossier include installation?
No. The dossier is the system's engineering. We quote installation separately if you need it; we have installed 4.80 and 4.86 kWp systems on buildings in Lima.
What if the rooftop or the board changes during construction?
We update the dossier with the new design. It is a shorter, lower-cost service than the initial dossier.
Can you update a study made by another designer?
Yes. We redo the simulation and drawings with our equipment and data sheets, based on the project's approved information.
What do I need to request a proposal?
The project location, the grade you are seeking and the rooftop and electrical drawings. With that we send the proposal.
Send us the drawings and get the proposal
Write to us with the project location, the grade you are seeking and the rooftop drawings. We reply with a fixed-price proposal.
Request a dossier